Flood Information

Home Repairs After a Flood

Those who receive damage to their homes due to flooding must obtain a Building Permit before work begins to make repairs. 

To obtain a flood permit, the applicant must submit a building permit application and a detailed cost estimate/schedule of values for the work. This can be an estimate from a contractor or an insurance adjuster. The Building Department will not accept a total amount unless supporting documentation is provided.

Homeowners may pull the permit and hire subcontractors to work under the permit. To do this, a detailed cost estimate and a permit application must be submitted. All subcontractors must have or obtain a current Pelham Business License before performing their portion of work. To verify if a contractor has a proper business license with the City of Pelham please call 205.620.6480.

If hired by a homeowner, Certified State of Alabama Home Builders can pull the permit on the homeowner's behalf and submit the required documentation.

The turnaround to get a building permit is three business days. Permit applications and supporting documentation can be emailed to the Building Permit Office or dropped off in person to the Building Department, which is located on the 2nd floor of City Hall at 3162 Pelham Parkway, Pelham, AL 35124.

If you have questions about anything related to flooding or recovering from a flood, please email the Flood Plain Administrator.

FAQs

Why do I need a permit to do work on my own property?

The City has adopted a comprehensive set of building codes that must be followed on construction projects within the City. These building codes govern the design, construction, alterations, and maintenance of structures. Building codes establish the minimum requirements to safeguard the health, safety, and welfare of the building's occupants. The permitting process is designed to allow the City to ensure that work is in compliance with the building codes.  It also allows the City to ensure that contractors working in the City are properly licensed. 

Why was a Stop Work Order issued?

Stop Work Orders are issued by the City of Pelham when work is ongoing that does not conform to the City’s Code of Ordinances. The most common reason for a Stop Work Order being issued is for ongoing construction work not being properly permitted. The reason a Stop Work Order was issued on your property is listed on the Order. 

How much does a permit cost?

For new construction, the City charges a permitting fee. In response to large-scale events such as a tornado or a flood, the City will often waive all permitting fees. 

How do I obtain a permit?

You can find information about obtaining a permit in several ways:

Flood Ordinance Procedures

Structures in the Special Flood Hazard Area must meet construction requirements of the Flood Plain Ordinance in certain situations. Read a comprehensive breakdown of the Flood Ordinance Procedures.

Other Helpful Resources